Biomass at an old people’s home in Perales del Campo

Instalación solar fotovoltaica en Ariza
Mixed solar photovoltaic facility in Ariza (grid connection)
22 January, 2015
Biomasa en Lavandería Polarier Tilsa
Biomass for the boiler room at the Polarier Tilsa Laundry
19 January, 2015
Mostrar todo
Residencia de ancianos Perales del Campos

Biomass boiler room for heat supply and DHW in communities of owners

Technology used: Biomass.
This is biomass multi-fuel hot water boiler installed in a Community Association


NOMINAL POWER 600kW (400 + 200)
FUEL Pellets, Chips, Almond shells
START-UP YEAR 2013
LOCATION Perales del Campo (Palencia)