Biomass boiler room for heat supply at the Javier Shrine
Technology used: Biomass.
This is a biomass hot water boiler facility, installed at the Javier Shrine, Navarre.
NOMINAL POWER | 840KW |
FUEL | Chips |
START-UP YEAR | 2013 |
LOCATION | Javier (Navarra) |